In some industry (electronics,
pharmaceutical, food preparation, pneumatic conveying, etc.)
or for installations with external pipe work, a pressure DewPoint
of +3°C from a refrigerant dryer is not sufficient.
For these applications, a heatless adsorption
dryer is required supplying compressed air at a pressure
DewPoint of down -70 °C. Heatless dryers are compact and
have low purchase and maintenance costs.
The HDT heatless adsorption dryers
consist of two parallel vessels filled with adsorption material
(molecular sieve).
While compressed air is dried in one tower, the second saturated
tower, having just come off line, is regenerated. A small amount
of dried compressed air is used for this purpose.
|
|
|
|
|
| |
 |
 |

Standard for all models
HDT 3-25 dryers are supplied with DDC12
electronic instrument. Internal micro-processor permits the selection
of working pressure DewPoint (-20°C, -40°C or -70°C),
while synoptic panel informs the operator of the working phases of
the dryer.
From model HDT 30 the dryers are equipped
with DDC15 electronic instrument. The
controller, developed from previous model, performs a careful and
precise management of the dryer, through following functions :
- the selection of working pressure DewPoint (-20°C, -40°C
or -70°C);
- the detailed information of dryer function and possible faults by
using synoptic panel;
- the indication of the load factor settings and/or the real DewPoint
(if optional DewPoint probe is installed), via the ten LED display
bar;
- the selection of dryer operation mode (FIX : with fix cycle time,
DPD : with cycle time proportional to effective working load - if
optional DewPoint probe is installed, TEST : for diagnostic cycle
- the dryer runs step-by-step in order to insure easy troubleshooting
in order to assist in repairs);
- the control and the management of three different energy saving
levels (the load factor set by the operator, dryer operation according
to air compressor load, or the load depending on real DewPoint, if
optional DewPoint probe is installed);
- the diagnostics of possible fault/alarm : maintenance required,
tower cycle has not taken place in correct way (if optional pressure-switch
kit is installed), the pressure DewPoint is too high (if optional
DewPoint probe is installed);
- the control of programmed maintenance operation.
DDC 15 includes a RJ45 serial port (RS 232 standard) allowing the
connection to a network managed by PC or PLC. |
 |
 |
 |

Optional for all models
IP55 Pressure-Switches in order to enable “FAIL TO SWITCH”
alarm of DDC15 Controller. |
 |
 |
 |

Optional for all models
Pressure DewPoint meter, including sampling system, wired to DDC15
Controller. Calibration certificate is included. |
 |
 |
 |

Optional for all models
Pressure-Switches + Pressure DewPoint meter Kit. |
 |
|